House construction Progresses – We’re past Lockup – Solar System is installed

With Christmas just around the corner it’s time for another house update. Things have progressed quite a bit since the last update but also a lot slower. The house has finally reached lockup and  hence we only get to see what’s happening when trades men are around.

Format Homes have continued working on the house and each week a little bit more has been done. Since the last update the following has happened:

All of this happened over the few weeks since the last update. Sadly it doesn’t look like we’ll be in by Christmas. This seems to be due to the Tiler who, whilst doing a good job, is also quite slow.

On the flip side, Solaris has almost fully installed our 3.3kw Solar system. Including batteries, inverter, regulator and panels. It took the guys a week to install and they did a great job at making it work, look good and were very professional.

Below is some photos of the progress of both the house and the solar system installation.